Bridge (Przegalina)
Unit description
The newly built bridge in Przegalina (on the canal linking the Wisla River with its old riverbed - Martwa Wisla River) is a weighing nearly 50 tonnes span of the drawbridge of 21 meters in length. The facility was built in 2012. The investor is the Gdansk Road and Green Administration
Year Built | 2012 |
Length | 21 m |
Width | bd |
Weight | ~50 t |
Scope of work
AN-ELEC in 2011 was responsible for the construction of the drawbridge in Przegalin:
- complete installation
- construction, assembly and commissioning of switchgears
- construction, assembly and commissioning of the control panel
- execution and implementation of the bridge automation and hydraulics control algorithm based on the ABB AC500 controller (distributed system)