The Blackford Dolphin project is a modernization of the drilling platform built in 1974. Initially it was intended to include only the maximum drilling depth. However, it was transformed into a large renovation project in 2007/2008. Finally, the platform was renovated and the drilling depth increased from 600 to 7000 feet.

Year Built 1974
Length 50 m
Width 14 m
IMO 8753122

Scope of work

On Blackford Dolphin project in 2007/2008, AN-ELEC was responsible for the following work

  • preparation of reconstruction documentation
  • electroinstallation works